<br/>
Activation date: 2020-02-11 <br/>
Event type: Other <br/>
<br/>
Activation reason: <br/>
This is an exceptional activation of the Risk and Recovery Mapping Service as the analysis does not represent the actual risk assessment, but has been defined by the needs of an exercise planned on 1 April 2020 by the fire-brigade and civil protection command team of the German city of Herne.The simulated scenario consists of a flooding event occurred in Herne due to high water levels of the Emscher river, caused by heavy rainfall over the German cities of Dortmund and Castrop-Rauxel. The southern through wall of the Emscher is damaged at the point: 51.551 N 7.140 E, and breaks at 08.00 a.m. This moment will be considered as the starting point for the exercise. Parts of Herne are instantaneously flooded. Particularly, all areas below 40 m a.s.l may be fully flooded. On the contrary, the northern areas with respect to the Emscher river remain unaffected.The aim of this CEMS Risk and Recovery Standard activation is to provide the fire-brigade and civil protection command team of the German city of Herne with the modelled flood extent (i.e. P05 - Modelled Flood extent for major events) to be used during the planned exercise.Proposed solution and resultsFigure 1 shows the Modelled flood extent for major events map obtained from the hydraulic modelling, while Figure 2 shows a zoom of the position in which the breakage of the banks is assumed. The maximum water depth estimated for the AOI is 6.5m.Figure 1: modelled flood overview. Figure 2: zoom on location of the rupture of the weir. <br/>
<br/>
Build on reliable and scalable technology
FAQ
Frequently Asked Questions
Some basic informations about API Store ®.
Operation and development of APIs are currently fully funded by company Apitalks and its usage is for free.
Yes, you can.
All important information such as time of last update, license and other information are in response of each API call.
In case of major update that would not be compatible with previous version of API, we keep for 30 days both versions so you will have enough time to transfer to new version. We will inform you about the changes in advance by e-mail.