Dataset Direct Download Service (WFS): Zone du PLU of the municipality of Dompierre Becquincourt

Open data API in a single place

Provided by BUREAU DE RECHERCHES GÉOLOGIQUES ET MINIÈRES

Get early access to Dataset Direct Download Service (WFS): Zone du PLU of the municipality of Dompierre Becquincourt API!

Let us know and we will figure it out for you.

Dataset information

Country of origin
Updated
2019.03.25 00:00
Created
Available languages
French
Keywords
WFS 1.1.0
Quality scoring

Dataset description

The Urban Planning Code defines four types of areas regulated in the local planning plan (R.123-5 to 8): urban areas (U), areas to be urbanised (AU), agricultural areas (A) and natural and forest areas (N). These areas shall be demarcated on one or more graphic documents. A regulation is attached to each area. The by-law may lay down different rules, depending on whether the purpose of the construction relates to housing, hotel accommodation, offices, commerce, crafts, industry, agricultural or forestry operations or warehouse functions. These categories are limited (Art. R.123-9).The areas already urbanised where existing or under construction public facilities have sufficient capacity to serve the buildings to be installed are classified as U-areas.The natural areas of the municipality may be classified as AU zones, which are intended to be opened for urbanisation depending on whether or not the existing equipment on the periphery is sufficient to serve the buildings to be installed. There are two types of AU zone: “constructible” and “inconstructible” areas.Can be classified as zones A, the areas of the municipality, whether or not equipped, to be protected due to the agronomic, biological or economic potential of agricultural land.Can be classified as N zones, the areas of the municipality equipped or not, to be protected either by reason of the quality of the sites, natural habitats, landscapes and their interest, in particular from the aesthetic, historical or ecological point of view, either the existence of a forestry operation or their nature as natural areas.- Within the N zones, can be: perimeters in which possibilities for the transfer of the right to build can be carried out (transfer of COS),- areas of limited size and capacity where construction is possible under the condition of implantation and density.
Build on reliable and scalable technology
Revolgy LogoAmazon Web Services LogoGoogle Cloud Logo
FAQ

Frequently Asked Questions

Some basic informations about API Store ®.

Operation and development of APIs are currently fully funded by company Apitalks and its usage is for free.
Yes, you can.
All important information such as time of last update, license and other information are in response of each API call.
In case of major update that would not be compatible with previous version of API, we keep for 30 days both versions so you will have enough time to transfer to new version. We will inform you about the changes in advance by e-mail.

Didn't find the API you need?

Let us know and we will figure it out for you.

API Store provides access to European Open Data via scalable and reliable REST API interface.
Copyright © 2024. Made with ♥ by Apitalks