The PM3 easements result from the establishment of technological risk prevention plans (RTPPs) designed to limit the effects of accidents likely to occur in facilities classified for the protection of the environment (ICPE) listed in the list provided for in Article L. 515-8 of Article L. 515-8 of the Environmental Code or in the underground storage facilities referred to in Article 3-1 of the Mining Code and which may cause effects on public health, public health and safety directly or by pollution of the environment.
These plans define, around such facilities or storages, a perimeter of exposure to risks.
Within this perimeter, PPRTs can:
— delimiting areas in which the construction of developments or works and new constructions and the extension of existing buildings are prohibited or subject to compliance with requirements relating to construction, use or operation,
— provide, within those areas, on the one hand, areas in which a right of abandonment of buildings or parts of buildings existing on the date of approval of the plan, on the other hand, may be established for areas where expropriation is possible,
— prescribing measures for the protection of populations (including work on the existing building) to be taken by owners, operators and users within the time limits specified in the plan.
This resource describes locally ICPEs or underground storage sites generating PM3 easements.
Build on reliable and scalable technology
FAQ
Frequently Asked Questions
Some basic informations about API Store ®.
Operation and development of APIs are currently fully funded by company Apitalks and its usage is for free.
Yes, you can.
All important information such as time of last update, license and other information are in response of each API call.
In case of major update that would not be compatible with previous version of API, we keep for 30 days both versions so you will have enough time to transfer to new version. We will inform you about the changes in advance by e-mail.