Map visualisation service (WMS) of the dataset: Zones of the PLU (doc. of 12.03.2013) of the commune Les Aix-d’Angillon

Open data API in a single place

Provided by BUREAU DE RECHERCHES GÉOLOGIQUES ET MINIÈRES

Get early access to Map visualisation service (WMS) of the dataset: Zones of the PLU (doc. of 12.03.2013) of the commune Les Aix-d’Angillon API!

Let us know and we will figure it out for you.

Dataset information

Country of origin
Updated
2021.09.16 00:00
Created
Available languages
French
Keywords
WMS 1.3.0, WMS 1.1.1
Quality scoring
195

Dataset description

The Urban Planning Code defines four types of areas regulated in the local urban planning plan (R.123-5 to 8): urban areas (U), urban areas (AU), agricultural areas (A) and natural and forest areas (N). These areas are delimited on one or more graphic documents. A settlement is attached to each zone. The regulation may lay down different rules, depending on whether the purpose of the constructions concerns housing, hotel accommodation, offices, commerce, crafts, industry, farming or forestry or the function of warehouse. These categories are limited (Article R.123-9).The already urbanised sectors where existing or under construction public facilities have sufficient capacity to serve the constructions to be installed may be classified as AU zones, the natural areas of the municipality intended to be open to urbanisation depending on whether or not the existing equipment on the periphery is sufficient to serve the constructions to be installed. There are two types of AU zone: areas AU ‘constructible’ and ‘inconstructible’ AU areas.Can be classified as zones A, sectors of the municipality, equipped or not, to be protected because of the agronomic, biological or economic potential of agricultural land.Can be classified as N areas, the areas of the municipality equipped or not, to be protected either because of the quality of the sites, natural environments, landscapes and their interest, in particular, from an aesthetic, historical or ecological point of view, either of the existence of a forestry operation or of their nature as natural areas.- Inside areas N, may be delimited: perimeters in which possibilities of transfer of right to build can be made (transfer of COS), — sectors of limited size and capacity where constructions are possible under conditions of location and density.
Build on reliable and scalable technology
Revolgy LogoAmazon Web Services LogoGoogle Cloud Logo
FAQ

Frequently Asked Questions

Some basic informations about API Store ®.

Operation and development of APIs are currently fully funded by company Apitalks and its usage is for free.
Yes, you can.
All important information such as time of last update, license and other information are in response of each API call.
In case of major update that would not be compatible with previous version of API, we keep for 30 days both versions so you will have enough time to transfer to new version. We will inform you about the changes in advance by e-mail.

Didn't find the API you need?

Let us know and we will figure it out for you.

API Store provides access to European Open Data via scalable and reliable REST API interface.
Copyright © 2024. Made with ♥ by Apitalks