Simple download service (Atom) of the dataset: Table containing point generators linked to easements of category PT2 (protection of radio-electric emission and reception centres against obstacles) in Haut-Rhin
Open data API in a single place
Provided by BUREAU DE RECHERCHES GÉOLOGIQUES ET MINIÈRES
Get early access to Simple download service (Atom) of the dataset: Table containing point generators linked to easements of category PT2 (protection of radio-electric emission and reception centres against obstacles) in Haut-Rhin API!
Grade PT2 easements concern easements for the protection of radio transmission and reception centres against obstacles
They are established pursuant to Articles L. 54 to L.56-1 of the Postal and Electronic Communications Code in order to protect radio centres from physical obstacles which may hinder the spread of waves.
Two schemes should be distinguished:
— easements established for the benefit of radio centres concerning national defence or public security (Articles L.54 to L.56 of the Postal and Electronic Communications Code);
— easements established for the benefit of radio centres owned by private operators (Article L.56-1 of the Postal and Electronic Communications Code). However, in the absence of a decree implementing Article L.62-1 of the Postal and Electronic Communications Code, operators of electronic communications networks open to the public cannot benefit from radio easements to date.
A plan for the establishment of easements approved by decree sets out the areas that are subject to easement.
Four types of zone can be created:
— primary clearance zones and/or secondary clearance zones around each radio station transmitting or receiving radio waves using directional aerials, as well as around radio laboratories and research centres;
— special clearance zones between two centres providing a radio wave link exceeding 30 megahertz (i.e. with a wavelength of less than 10 metres);
— areas of clearance around radio-tracking stations or radionavigation stations of transmission or reception.
The consequence of servitude is:
— the obligation, in all these areas, for owners to carry out, if necessary, the removal or modification of buildings constituting buildings by nature pursuant to Articles 518 and 519 of the Civil Code. In the absence of an amicable agreement, the administration may expropriate these properties;
— the prohibition, in all these areas, of the creation of fixed or mobile obstacles, the highest part of which exceeds the ratings fixed by the easement order without the authorisation of the minister who operates or controls the centre;
— the prohibition, in the primary zone of release:
* an aeronautical safety station or radiogoniometric centre, to create or retain any fixed or mobile metalwork, bodies of water or liquids of any kind that may interfere with the operation of that facility or station;
* an aeronautical safety station, to create or maintain artificial excavations that may interfere with the operation of that station.
* the prohibition, in the special clearance zone, of creating structures or obstacles siuted above a straight line 10 metres below that joining the emission and receiving airplanes, but the height limitation imposed on a construction may not be less than 25 metres.
This resource describes the one-off generators of PT2 grade easements, i.e. the centroids of radio transmission and reception centres and stations
Build on reliable and scalable technology
FAQ
Frequently Asked Questions
Some basic informations about API Store ®.
Operation and development of APIs are currently fully funded by company Apitalks and its usage is for free.
Yes, you can.
All important information such as time of last update, license and other information are in response of each API call.
In case of major update that would not be compatible with previous version of API, we keep for 30 days both versions so you will have enough time to transfer to new version. We will inform you about the changes in advance by e-mail.