Annual national evolution of the lengths (km) of circuits in operation of the electricity transmission network by voltage level (63 kV, 90 kV, 225 kV, 400 kV, etc.) and by nature of evolution (new infrastructure, renewal, underground, railway, other modifications).
The evolutionary nature of a section is:
* New: when the installation of the section is subject to a new route (e.g. a new link)
* Renewed: when an overhead section is replaced by an overhead section or an underground section is replaced by an underground section
* Placed underground: when an overhead section is replaced by an underground section
* Scraped: when the section was physically removed from the network
* Other changes: these are all variations in length not recorded in the new and ferrailed sections. This mainly concerns sections placed in reserve (disconnected from the network but still in place) but also error or length corrections
* * *
Build on reliable and scalable technology
FAQ
Frequently Asked Questions
Some basic informations about API Store ®.
Operation and development of APIs are currently fully funded by company Apitalks and its usage is for free.
Yes, you can.
All important information such as time of last update, license and other information are in response of each API call.
In case of major update that would not be compatible with previous version of API, we keep for 30 days both versions so you will have enough time to transfer to new version. We will inform you about the changes in advance by e-mail.