The map shows the change in the mean potential soil removal by water (in t/ha and year) for the 30-year period 2071-2100 based on climate projection data. The soil removal is calculated on the basis of ABAG (‘General soil removal equation’) in accordance with DIN 19708 (2011). Positive values indicate an increase in soil removal in the future, negative a decrease.
Soil erosion is the removal of soil material through water and wind. The process of soil erosion caused by water depends on a variety of factors. These include climatic conditions (especially heavy precipitation), relief properties, use and cultivated crops and crop rotations, as well as soil-based location parameters.
The basis for climate data is the assumption of the IPPC’s “further-how-as-to-date” scenario RCP8.5 from the Fifth Assessment Report (AR5). This is a scenario that describes a continuous increase in global greenhouse gas emissions, resulting in an additional radiative propulsion of 8.5 watts per m² compared to pre-industrial levels by the end of the 21st century. For scenario RCP8.5, a variety of climate projections are available, resulting from different combinations of global and regional climate models (or regionalisation methods). From a maximum available total ensemble of 37 climate projections, a reduced ensemble with 10 climate projections was created at the LBEG using a selection method of the DWD.
The relevant climate model data (temperature and precipitation) were subjected to monthly BIAS adjustment (through linear scaling). For the identification term, the basic soil data is supplemented by relief data as well as data on land use. Shown are the mean value of the 30-year period considered, as well as the minimum and maximum value of the bandwidth.
Build on reliable and scalable technology
FAQ
Frequently Asked Questions
Some basic informations about API Store ®.
Operation and development of APIs are currently fully funded by company Apitalks and its usage is for free.
Yes, you can.
All important information such as time of last update, license and other information are in response of each API call.
In case of major update that would not be compatible with previous version of API, we keep for 30 days both versions so you will have enough time to transfer to new version. We will inform you about the changes in advance by e-mail.