Development plan Stellingen 49 1st amendment Hamburg

Open data API in a single place

Provided by GKSt GovData Freie und Hansestadt Hamburg

Get early access to Development plan Stellingen 49 1st amendment Hamburg API!

Let us know and we will figure it out for you.

Dataset information

Catalog
Country of origin
Updated
2022.12.20 22:03
Created
2022.10.18
Available languages
German
Keywords
öffentliche-pläne, bauleitplanung, bodennutzung, baunutzungsverordnung--baunvo, plis, baugesetzbuch--baugb, geoinformation, raumbezogene-information, bebauungsplan
Quality scoring
275

Dataset description

The Regulation on the zoning plan Stellingen 49 of 3 September 1998 (HmbGVBl. P. 199) is as follows: modified: 1. The attached “Appendix to the Regulation amending the Regulation on the Stellingen 49 development plan” is added to the Regulation. 2. In the drawing illustration of the laid down development plan Stellingen 49, the establishment of the closed construction method and the designation “(A)” are deleted in the industrial area. The fixing of a building height of 12 m to 14 m as a minimum and maximum dimension shall be changed to a building height of 14 m as a maximum. 3. Section 2 is amended as follows: 3.1.1 is amended as follows: 3.1.1 The first sentence is replaced by the following: ‘In the commercial area, airborne and odor-damaging establishments are listed in column 1 of the Regulation on installations requiring authorisation (4. BImSchV), as amended on 14 March 1997 (BGBl. I p. 505), as last amended on 15 July 2006 (BGBl. I p. 1619, 1623), inadmissible.’ 3.1.2 The following sentences are added: ‘In the commercial area, noise-damaging establishments and installations shall be permitted if the requirements set out in point 6.1.1(e), in compliance with point 3.2 and in particular point 3.2.1 of the Technical Instructions for the Protection against Noise (TA Noise) of 26 August 1998, are complied with in the residential areas adjacent to the east. Exceptions for entertainment venues shall be excluded.’ Points 2 and 3 are deleted. 3.3 The previous paragraphs 4 to 8 shall become points 2 to 6. 3.4 The following point 7 is added: 7. For compensatory measures, the industrial area is allocated an area of approximately 4 860 m² of land area 4351 to the Stellingen area outside the planned area.
Build on reliable and scalable technology
Revolgy LogoAmazon Web Services LogoGoogle Cloud Logo
FAQ

Frequently Asked Questions

Some basic informations about API Store ®.

Operation and development of APIs are currently fully funded by company Apitalks and its usage is for free.
Yes, you can.
All important information such as time of last update, license and other information are in response of each API call.
In case of major update that would not be compatible with previous version of API, we keep for 30 days both versions so you will have enough time to transfer to new version. We will inform you about the changes in advance by e-mail.

Didn't find the API you need?

Let us know and we will figure it out for you.

API Store provides access to European Open Data via scalable and reliable REST API interface.
Copyright © 2024. Made with ♥ by Apitalks