In the course of the construction of the Stetzsch flood pumping plant, a flood analysis for the local canal network of ITWH (2006) was carried out on the basis of several load cases. This topic included results for the Elbe flood and precipitation with a 10-year statistical recurrence. As further boundary conditions, the foreclosure of the canals along the Elbe at Elbe floods up to 6 m and the maximum pumping capacity were set. In this case, the shown channel shafts with at least 1 m³ volume overthaw.
Build on reliable and scalable technology
FAQ
Frequently Asked Questions
Some basic informations about API Store ®.
Operation and development of APIs are currently fully funded by company Apitalks and its usage is for free.
Yes, you can.
All important information such as time of last update, license and other information are in response of each API call.
In case of major update that would not be compatible with previous version of API, we keep for 30 days both versions so you will have enough time to transfer to new version. We will inform you about the changes in advance by e-mail.