Graphical representation of free network capacities for the connection of generation plants with a capacity of up to 750 kW in the existing medium-voltage networks of Bayernwerk Netz GmbH.
The presentation of connection options is a non-binding preliminary information and does not replace a network impact assessment!
Green line:
Connection of a system with up to 750 kW with high probability possible.
orange line:
Current capacity of the line limited.
Please contact the network operator for further clarification.
Build on reliable and scalable technology
FAQ
Frequently Asked Questions
Some basic informations about API Store ®.
Operation and development of APIs are currently fully funded by company Apitalks and its usage is for free.
Yes, you can.
All important information such as time of last update, license and other information are in response of each API call.
In case of major update that would not be compatible with previous version of API, we keep for 30 days both versions so you will have enough time to transfer to new version. We will inform you about the changes in advance by e-mail.