Historical loads from 2008. The sum of all inputs is the sum of inputs from decentralised generation plants and inputs from adjacent networks of the same grid level into the low-voltage grid. These are either measured (e.g. for EEG over 500 kW) or via feed-in profiles (e.g. small power plants, EEG below 500 kW). The sum of the inputs into the mid-panning network over time is published here. Data from 2008 onwards
Build on reliable and scalable technology
FAQ
Frequently Asked Questions
Some basic informations about API Store ®.
Operation and development of APIs are currently fully funded by company Apitalks and its usage is for free.
Yes, you can.
All important information such as time of last update, license and other information are in response of each API call.
In case of major update that would not be compatible with previous version of API, we keep for 30 days both versions so you will have enough time to transfer to new version. We will inform you about the changes in advance by e-mail.