PAI: Split plan of the river strips (PSFF) — Project limit between band B and C indicating the hydraulic works planned for the protection of the territory, competing with the achievement of the design of the watercourses bounded by the river strips. Scopo:Definire the limit of the floodbed and the flooded areas and identify the protection measures to be carried out, trying to establish a balance between the needs of the containment of the flood and the rolling of the same, and to safeguard and recover where possible the characteristics of naturalness and the ecological continuity of the river system.
Build on reliable and scalable technology
FAQ
Frequently Asked Questions
Some basic informations about API Store ®.
Operation and development of APIs are currently fully funded by company Apitalks and its usage is for free.
Yes, you can.
All important information such as time of last update, license and other information are in response of each API call.
In case of major update that would not be compatible with previous version of API, we keep for 30 days both versions so you will have enough time to transfer to new version. We will inform you about the changes in advance by e-mail.