Land, road and hydraulic engineering (GWW); input price index 2000 = 100, from 1979 onwards

Open data API in a single place

Provided by Ministerie van Binnenlandse Zaken en Koninkrijksrelaties

Get early access to Land, road and hydraulic engineering (GWW); input price index 2000 = 100, from 1979 onwards API!

Let us know and we will figure it out for you.

Dataset information

Country of origin
Updated
Created
Available languages
Dutch
Keywords
Quality scoring
195

Dataset description

The historical series 'Ground, road and hydraulic engineering; input price index 2000=100, from 1979' shows the development of the cost of labour, material and equipment for Ground, Road and Water Projects (GWW) in the Netherlands. This series was created by linking independently of each other series from the past. There are currently eight sub-areas within the GWW. These domains are derived from the standard Classification Products to Activity. In addition, there is one more sub-area for which no observation has been made since 2005. For each sub-area an index series is determined on the basis of the price developments of the different cost components from which the product to be realised — in this case a project in the GWW — is constructed. The price index for the Total GWW is a weighted average of the eight sub-areas. The published price indices of the GWW are based on the average price level of the relevant month. In addition to price indices, developments are also published compared to 1 year earlier. When compiling this index, changes in general costs and ‘profit & risk’ are not taken into account. Also, changes in excise duties (e.g. those of the ‘red’ diesel as of 1 January 2013) are not reflected in the price indices. Data available from: The series of different sub-areas of ground, road and hydraulic engineering can cover different periods. Some start in 1979, while others only started at the base shift to 2000=100. The period for which a series of figures is given is shown below: — 4211c: Maintenance of roads: from February 1979; stopped in October 2004 — 4211a: Roads with open hardening: from February 1979 — 4211b: Roads with closed hardening: from February 1979 — 4221: Articles for liquids: from February 1979 — 4312: Site preparation: from February 1979 — 42/43: Ground, road and hydraulic construction: from January 2000 — 4212: Upper and underground railways: from January 2000 — 4213: Bridges and tunnels: from January 2000 — 4291: Hydraulic engineering works: from January 2000 — 4321: Electrical installations: from January 2005 Status of the figures: The price indices are definitive until 2020. The other price indices are provisional. The period during which the price indices are provisional depends on when the collective agreements involved in the GWW are concluded. This period may vary from 4 to approximately 16 months after the period for which the figures are calculated. Changes as of 28 February 2022: The January 2022 price indices have been added. When will there be new figures? Provisional figures for April 2022 will be published by the end of May 2022.
Build on reliable and scalable technology
Revolgy LogoAmazon Web Services LogoGoogle Cloud Logo
FAQ

Frequently Asked Questions

Some basic informations about API Store ®.

Operation and development of APIs are currently fully funded by company Apitalks and its usage is for free.
Yes, you can.
All important information such as time of last update, license and other information are in response of each API call.
In case of major update that would not be compatible with previous version of API, we keep for 30 days both versions so you will have enough time to transfer to new version. We will inform you about the changes in advance by e-mail.

Didn't find the API you need?

Let us know and we will figure it out for you.

API Store provides access to European Open Data via scalable and reliable REST API interface.
Copyright © 2024. Made with ♥ by Apitalks