Electricity Transmission Data for the European Case Study

Open data API in a single place

Provided by Zenodo

Get early access to Electricity Transmission Data for the European Case Study API!

Let us know and we will figure it out for you.

Dataset information

Country of origin
Updated
2024.12.16 00:00
Created
2024.01.01
Available languages
English
Keywords
Quality scoring

Dataset description

The data is focused only on cross-border transmission (interconnector) data between countries in the PECD1 region. A comprehensive dataset for each country's transmission network will follow in subsequent phases of the project. The primary sources for this data are publicly available resources, including ENTSO-E (https://transparency.entsoe.eu/transmission-domain/physicalFlow/show) and the TYNDP 2022 report (https://2022.entsos-tyndp-scenarios.eu/download/#use). Overview of the Data The initial dataset provides information on: Cross-border links: Existing transmission capacities between countries. Expansion candidates: Future development projects for electricity transmission across Europe, covering the time horizon from 2030 to 2050. For investment candidates, two categories are included: Real Projects:These are projects that have been thoroughly investigated in previous TYNDP cycles. They are typically expected to be commissioned in the near future and possess more defined technical and economic characteristics. Concept Projects:These represent potential projects with expected commissioning dates beyond 2040. The technical and economic parameters for these projects are less certain, reflecting their conceptual stage. Both real and concept project capacities are aggregated for the year 2050. Data Components The dataset encompasses the following key elements: Existing Capacity The existing capacity of the of the cross-border interconnection that are in operation Incremental Capacity:This represents additional capacity added to borders that already have existing transmission links. Capital Costs:The dataset includes the cost of interconnectors, accounting for both their length and capacity. These costs also incorporate expenses related to internal reinforcement of the transmission grid. Interconnection Type:The type of transmission technology is specified for each interconnection, indicating whether it is overhead, subsea, or a combination of overhead and subsea.
European data infrastructure with broad catalog discovery, free evaluation access and production-grade API options.
190K+
indexed dataset pages
32
countries and EU institutions
2019
API-first since
Free API quota
for evaluation and prototypes
SLA
history and push on production APIs
FAQ

Questions before production use

Practical answers on evaluation, licensing, freshness, versioning and support.

api.store is built and operated by Apitalks s.r.o. Company details and a direct contact path are linked in the footer for vendor checks and procurement review.
Yes. Selected APIs include a free API quota, so your team can validate coverage, freshness, response shape and workflow fit before asking for a production plan.
Often yes, but usage rights depend on the source license and dataset. We surface source, license and update metadata where available, and can help review terms before a production integration.
Maintained APIs include update metadata where available. For production integrations, we can add history, monitoring and push updates so changes are easier to detect and act on.
Production APIs can add SLA, stable identifiers, versioning support, history, push updates and direct support around the data your product or AI workflow depends on.

Didn't find the API you need?

Let us know and we will figure it out for you.

European data discovery with free evaluation access and production-grade API options.

Copyright © 2026. Made by Apitalks