Relocation of Wilhelmsburger Reichsstraße Hamburg

Open data API in a single place

Provided by Behörde für Stadtentwicklung und Wohnen (BSW)

Get early access to Relocation of Wilhelmsburger Reichsstraße Hamburg API!

Let us know and we will figure it out for you.

Dataset information

Country of origin
Updated
2026.02.19 17:52
Created
2026.02.18
Available languages
English
Keywords
öffentliche-pläne
Quality scoring

Dataset description

This map shows the planned course of the relocated Wilhelmsburg Reichsstraße B4/75. The basis is the planning of the DEGES for the planning approval decision for the relocation of the federal road B 4/75 (Wilhelmsburger Reichsstraße) between the junctions HH-Georgswerder and HH-Wilhelmsburg-Süd together with the adaptation of railway operating facilities. It is planned to bundle the federal road B4/75 between the aforementioned junctions on a length of about 4.6 km with the eastern railway facilities. In addition to the planned four-lane new construction of the federal road with a control width of 28 m and the conversion of the HH-Wilhelmsburg-Süd junction, the corresponding adaptations of the railway operating facilities and the production of extensive noise protection systems are planned. Furthermore, a junction HH-Wilhelmsburg-Mitte with connection to Rotenhäuser Straße is planned. Urban roads directly affected by the project, such as the Kornweide, the Vogelhüttendeich and the Rotenhäuser Straße and their intersection with the Dratelnstraße / Rubbertstraße, are also to be adapted. The areas on which the new highway is to be run are currently still partly occupied by railway operating facilities. It is therefore planned to rearrange the tracks without loss of capacity for line traffic. In particular, the westernmost track is to be moved further to the east. The project also includes preventive, compensatory and replacement measures, including noise protection measures along the road and railway facilities, structural prevention of harmful environmental effects, preventive measures during the implementation of the construction measure, compensatory measures on other areas in Hamburg-Wilhelmsburg and Bergedorf for interventions in nature and landscape. Active noise protection measures are planned on roads and tracks, in particular noise barriers with a total length of approximately 15.1 km and a height of predominantly 4 m or more.
European data infrastructure with broad catalog discovery, free evaluation access and production-grade API options.
190K+
indexed dataset pages
32
countries and EU institutions
2019
API-first since
Free API quota
for evaluation and prototypes
SLA
history and push on production APIs
FAQ

Questions before production use

Practical answers on evaluation, licensing, freshness, versioning and support.

api.store is built and operated by Apitalks s.r.o. Company details and a direct contact path are linked in the footer for vendor checks and procurement review.
Yes. Selected APIs include a free API quota, so your team can validate coverage, freshness, response shape and workflow fit before asking for a production plan.
Often yes, but usage rights depend on the source license and dataset. We surface source, license and update metadata where available, and can help review terms before a production integration.
Maintained APIs include update metadata where available. For production integrations, we can add history, monitoring and push updates so changes are easier to detect and act on.
Production APIs can add SLA, stable identifiers, versioning support, history, push updates and direct support around the data your product or AI workflow depends on.

Didn't find the API you need?

Let us know and we will figure it out for you.

European data discovery with free evaluation access and production-grade API options.

Copyright © 2026. Made by Apitalks