HWRM cards 1.Cycle Hamburg

Open data API in a single place

Provided by Behörde für Umwelt, Klima, Energie und Agrarwirtschaft (BUKEA)

Get early access to HWRM cards 1.Cycle Hamburg API!

Let us know and we will figure it out for you.

Dataset information

Country of origin
Updated
2025.12.23 22:30
Created
2025.12.22
Available languages
English
Keywords
umweltdaten, überflutung, risikokarte, hochwasserrisikobewertung, hochwasserrisiko, hochwasserereignis, risikogebiet, mittlere, geodaten, hochwasserrisikomanagement, hq100, hq20, richtlinie-2007-60-eg-des-europäischen-parlaments-und-des-rates-vom-23.-oktober-2007-über-die-bewert, überflutungsgebiet, hq200, überflutungsflächen, häufige, öffentliche-pläne, überflutungsbereich, gefahrenkarte, hw-szenarien, binnenhochwasser, hq10, wasserhaushaltsgesetz--whg, seltene
Quality scoring

Dataset description

Technical description: The aim of the EC Directive on Flood Risk Management is to reduce the risks arising from flooding. The first of three mandatory steps towards this goal is flood risk assessment. As a result, the risk areas for inland flooding and storm surge are published here. The second step is the identification and presentation of hazard and risk maps in the risk areas. The hazard and risk maps each cover three flood events. For inland floods, the frequent event (marking: H for High) a 10-year, medium event (marking: M for Middle) a 100-year and the rare event (marking: L for Low) is a 200-yearly. For the areas at risk from storm surges, the frequent event is a 20-yearly event, the medium event as in the case of inland floods is a 100-yearly event and the rare event is an extreme event in which a rare, extremely high water level (7.30 m asl at the St. Pauli level) is assumed and in addition the effect of the flood protection systems is disregarded. The hazard maps show the extent of flood events in the form of the extent and the water depths that occur. The risk maps show how the affected areas are used, the location of industrial plants and protected goods and the number of potentially affected inhabitants. The final step is to develop a flood risk management plan. Legal background: The Flood Risk Management Directive (2007/60/EC of 23 October 2007) regulates the preparation and publication of flood risk maps. The legal transposition of this EC Directive into national law took place with the amendment of the Water Resources Act of 1 March 2010. The data for flood risk management (HWRM) maps of the 1st reporting cycle (2013-2019) are provided here as a WMS representation service and as a WFS download service.
European data infrastructure with broad catalog discovery, free evaluation access and production-grade API options.
190K+
indexed dataset pages
32
countries and EU institutions
2019
API-first since
Free API quota
for evaluation and prototypes
SLA
history and push on production APIs
FAQ

Questions before production use

Practical answers on evaluation, licensing, freshness, versioning and support.

api.store is built and operated by Apitalks s.r.o. Company details and a direct contact path are linked in the footer for vendor checks and procurement review.
Yes. Selected APIs include a free API quota, so your team can validate coverage, freshness, response shape and workflow fit before asking for a production plan.
Often yes, but usage rights depend on the source license and dataset. We surface source, license and update metadata where available, and can help review terms before a production integration.
Maintained APIs include update metadata where available. For production integrations, we can add history, monitoring and push updates so changes are easier to detect and act on.
Production APIs can add SLA, stable identifiers, versioning support, history, push updates and direct support around the data your product or AI workflow depends on.

Didn't find the API you need?

Let us know and we will figure it out for you.

European data discovery with free evaluation access and production-grade API options.

Copyright © 2026. Made by Apitalks